Turkey, Leveling for the Sivas-Kars track maintenance

On the route from Erzincan (ca. 934 km) through Erzurum (ca. 1149 km) to Sarikamis (ca. 1306 km), the track is to undergo maintenance. TRIGIS was commissioned to carry out leveling in connection with track maintenance.

Measurement area layout

Method

Due to missing documents, it was necessary to establish a new survey station as well as a new route in advance. The data on track maintenance could only be collected after this groundwork was completed. The technical specifications of the TCCD (as of 2013) serve as the basis for all survey work.

Services

  • Verification of survey station
  • Construction of the double leveling at a length of 160 km
  • Precision requirement ± 0.7 mm/km
Measurement results analysis
Along the route
Along the route
back

TRIGIS - THE WORLD OF GEODATA

// Search